Shinn Mechanical, Inc. is equipped to handle mechanical construction projects of all sizes and complexities. Whether it is industrial piping, building hydronics, steam systems, natural gas piping, plumbing systems, refrigeration, HVAC, or anything mechanical-related, Shinn can offer the expertise and resources to get the job done. With our diverse workforce, comprised of multiple trades, Shinn Mechanical is able to self-perform the complete mechanical scope for nearly any project.

Throughout our history, Shinn Mechanical has completed work for clients in a broad array of industries, both public and private.

The portfolio below highlights some specific projects that we have completed.

project-img09

Seatac South Terminal Expansion Project: $1.2M

Installation of large bore hydronic piping and natural gas piping. Extended existing services down a utility tunnel and tied into a new mechanical room. Work area was in the middle of airport operations support center, majority of work performed on off hours to allow minimal disruption to the Port of Seattle operations. Project also involved…

project-img04

Tacoma General Multicare Boiler: $6.3M

Shinn Mechanical was the lead mechanical for this project. We were responsible for all MEP coordination, pipe fabrication, and field installation for a new Boiler Plant. Included: (1) 600 BHP steam boiler and (2) 1,200 BHP steam boilers. Installation of steam and condensate piping, including extensive work inside the existing hospital to tie the new…

project-img11

University of Washington Oceanography Building: $5.6M

New lab facility with twenty five complex piping systems ranging from chilled water, steam, pure water, compressed air, vacuum, hot water, acid waste and HVAC and stainless steel fume exhaust systems.

project-img06

Washington State Corrections Center – Shelton Steam Distribution: $4M

Installation of over 1 mile of concrete utilidor containing steam and condensate piping, originating at a central plant and distributed to all buildings on the campus. Included the installation of new PRV stations at every building. Multi system testing and hookup involved, without interruption to the occupied prison facility. This was an efficiency improvement project…

project-img07

Washington State Corrections Center – Shelton Domestic Water Repipe: $1.5M

The project involved removal and replacement of over 5,000 feet of hot and domestic water in Building ‘G’ at the Shelton Correctional Facility. Work included modifications to the existing steam system, furnish and install of new laundry supply/filtration system, and all new domestic water piping to the kitchen. The kitchen provided prisoners with three meals…