Bow Lake Recycling and Transfer Station: $4.8M

 

project-img02Shinn Mechanical was the prime mechanical contractor on this project, which involved the construction of a new transfer station for King County at the existing Bow Lake site. Shinn provided the heating water, condenser water, compressed air, methane vent, and fuel piping systems. The project also included a tire wash system, dust/odor control misting system, and fuel facility, all of which were furnished and installed by Shinn. Subcontracted work consisted of plumbing, HVAC ductwork, building automation & controls, mechanical insulation, and testing/adjusting/balancing (TAB).